Espaņol| Home | Our Story | Distributors | News | Contact Us |

| Catalog | Manual | Features | Designation | Warranty | Calculator

Introduction

Terms
Specifications

Cable
Construction

Portable Marking
Unit

Stationary Drum
1 Capstan

Stationary Drum
2 Capstan

Steps to Good
Cable Care

Calculating
Pull-Out Point

Rehead Strenght
Calculations

Specific Gravity
Weight and Pressure
Table

Calculating
Stuck Point

When Tool or
Cable is Stuck

Steps to Find
Stuck Point

Eliminating Errors

Things to check

Back to Manual Menu

 

 

CABLE CARE

Things to check

  • Collapsed or mashed casing

  • Deviated hole

  • Sidetracked hole

  • Was a Drill Stem Test run

  • D.V. tool

  • Trouble running pipe

  • Tight spots when tripping bit

  • What was done to the well prior to 
    your arrival on location

  • Was a packer set near this depth

  • Was a bridge plug drilled out near this depth

  • Did you notice a weight loss near this depth
    when going in the hole

 

Gather all the information and facts you can and write down what you find out. Present the information to the company representative, and a  supervisor. Then make a decision and put together a plan of action that all agree to

 

Previous Page | Print Page

Camesa, Inc · 1615 Spur 529 · P.O. Box 1048 · Rosenberg, Texas 77471
Phone: (281) 342-4494 · Fax: (281) 342-0531